Prime Day

Como cliente Amazon Prime obtén 3 meses de Audible gratis

Diseño de la portada del título The Millpond Line

The Millpond Line

Tidal Reach, Book 1

Muestra
Comenzar mi suscripción Prueba gratis durante 30 días
Oferta válida hasta el 28 de diciembre de 2026.
Después de los 30 días, 9,99 €/mes. Cancela tu siguiente plan mensual cuando quieras.
Ahorra más del 90% en tus primeros 3 meses.
Escucha todo lo que quieras de entre miles de audiolibros y Originals incluidos.
Descarga tu audiolibro y escucha offline, sin interrupciones
Se renueva automáticamente por 9,99 €/mes después de 3 meses. Cancela mensualmente. La oferta termina el 28 de diciembre de 2026.
Disfruta de forma ilimitada de este título y de una colección con 90.000 más.
Escucha cuando y donde quieras, incluso sin conexión.
Sin compromiso. Cancela tu siguiente plan mensual cuando quieras.

The Millpond Line

De: Calla Marsh
Narrado por: Nicole Chaffin
Prueba gratis durante 30 días Prueba gratis durante 30 días

Después de los 30 días, 9,99 €/mes. Cancela cuando quieras.

Después de los 30 días, 9,99 €/mes. Cancela cuando quieras.

Compra ahora por 11,99 €

Compra ahora por 11,99 €

Ahorros de temporada | 0,99 € al mes durante los primeros 3 meses

9,99 €/mes después. Se aplican condiciones. Cancela mensualmente.

The flood map for Dunmore, Maine hasn't been updated since 1991. Floodplain engineer Sylvie Cord is here to fix that.

It's a technical job— LiDAR data, hydraulic models, regulatory paperwork. Sylvie is good at technical jobs. She arrives in early October with her field equipment and six weeks to produce a map accurate enough to withstand federal review, and she expects the usual resistance: a selectman who doesn't want bad news, residents who don't want their insurance rates to change, a town that has been operating on a fiction for thirty years.

What she doesn't expect is the berm.

The old Aldrich Mill impoundment sits above the lower village on a tidal river bend, held in place by an earthen embankment that hasn't been officially maintained since 1978. Without it, the lower village floods. With it, the town has been living under a quiet arrangement it never formally acknowledged.

Someone has been maintaining that berm. The evidence is in the materials invoices, the standpipe labeled 2019, the sound toe drainage on a structure that should have failed a decade ago. Fourteen years of correct, careful, unauthorized work— and all of it is about to appear in a federal document.

Town road commissioner Garen Finch has been doing the math since 2009. He knows what the map is going to say. He knows what happens to the lower village if the regulatory process goes the wrong way. And he knows that the engineer running the transects in the rain is not going to flinch from the accurate answer, even when the accurate answer costs something.

The Millpond Line is a slow-burn clean romance about precision and consequence, the gap between what a map says and what the ground does, and two people who show each other who they are through the work they won't set down.

©2026 Calla Marsh (P)2026 Calla Marsh
Cortejo Multicultural
adbl_web_anon_alc_button_suppression_t1
No hay reseñas aún